The INASOLAR project springs from the need of the municipality of Aras de los Olmos to be able to achieve an energy system that allows:
Use its own resources.
Achieve autonomous and sustainable operation
Achieve a low dependence on the grid.
Source: https://xarxajove.info/es/
Therefore, INASOLAR aims to achieve the following general milestones:milestones
Develop the infrastructure of renewable resources.
Achieve the supply of all consumption.
Autonomous operation of the municipality.
Achieve disconnection from the electricity grid.
To this end, it must be ensured that the generation of electricity from renewable sources always equals the demand.
The results of this pioneering system will allow:
Optimal use of natural resources.
Reduction in greenhouse gas emissions.
Transition to an energy model based on renewable resources.